Skip to content
Illustration: A specialist on a step ladder wiping tall wooden cabinets in a home

A sound structure, ready for the finishes you choose.

Shell construction in Ho Chi Minh City

UpClean arranges shell construction for townhouses, single-storey homes, villas and boundary walls in Ho Chi Minh City: foundations, frame, slabs, stairs, masonry, plastering, basic waterproofing and concealed electrical and plumbing conduits.

Fixed price

Priced by contract type, materials schedule and gross floor area, as set in the estimate

Indicative prices. Your Up specialist confirms a fixed price before any work begins.

Price and promises

Shell construction: key facts

You can choose labour with structural materials, or labour only if you supply materials yourself; concrete grade, steel, bricks and cement are listed in the estimate. Work starts only with a construction permit in place, or where the project is exempt, and payments follow the contract stages.

Price
Priced by contract type, materials schedule and gross floor area, as set in the estimate. Agreed before we start — no surprises.
Hours
7:00 AM – 8:00 PM, seven days a week
Areas
All of Ho Chi Minh City within its former boundaries, with no travel fee; most often Sala, Thu Thiem, Thao Dien, Phu My Hung and District 1.
On time
More than 15 minutes late, and you receive 10% off.
Guarantee
Any warranty terms are stated in the written contract; UpClean follows up on feedback during and after construction.
Report
Up Report: before/after photos and checklist via WhatsApp or Zalo.
Payment
After sign-off, by bank transfer or cash; larger projects may require a deposit. VAT invoices available.

Last updated

What's included

What's included in shell construction?

  • Drawing review and itemised shell estimate
  • Foundations, columns, beams, slabs, stairs
  • Walls, boundary walls and plastering
  • Basic waterproofing of wet areas and roof
  • Concealed conduits and pipes
  • Rebar check before each pour, staged sign-off

When to book

When do you need shell construction?

  • Drawings and permit ready, builder needed
  • You prefer to source finishes yourself
  • Boundary walls or small single-storey builds

How we work

Our 4-step shell construction process

  1. 01

    Send drawings

    Drawings, permit and location on WhatsApp +84 773 521 104.

  2. 02

    Survey & estimate

    Site and access checked, estimate prepared.

  3. 03

    Contract

    Materials, scope, timeline and payment stages in writing.

  4. 04

    Build & sign off

    Foundations to roof, checked stage by stage.

Illustration: A team cleaning a space after construction ahead of handover
Illustration: A specialist using a wet vacuum to dry a floor after construction
Illustration: A specialist cleaning a home entrance after building work
Illustration: A specialist cleaning skirting and floors after construction
Illustration: A specialist vacuuming a bedroom after construction and fit-out
Illustration: A worker in hi-vis and protective gear vacuuming a site after construction
Illustration: A worker carrying a bucket through a post-construction area beside safety warning signs
Illustration: A specialist scrubbing the floor and cleaning skirting indoors
Illustration: A specialist on a step ladder wiping tall wooden cabinets in a home

Why UpClean

What makes our shell construction different?

Materials in writing

Grades and types listed, easy to check on delivery.

Two ways to contract

With materials or labour only.

Easy next step

Move on to finishes with the same contact.

Up Report

Shell construction

08:42Before
09:31After
  • ✓Drawing review and itemised shell estimate — done
  • ✓Foundations, columns, beams, slabs, stairs — done
  • ✓Walls, boundary walls and plastering — done
  • ✓Basic waterproofing of wet areas and roof — done

Note: all items completed to the Up Standard, with a suggested date for the next visit.

Sample report format

After every visit, your Up Report arrives by WhatsApp or Zalo. Learn more

Frequently asked questions

Shell construction: your questions

What does shell construction include?+

Foundations, frame, slabs, stairs, roof slab, walls, plastering, basic waterproofing and concealed conduits, as listed in your estimate.

Can you build without drawings?+

Shell work follows structural drawings; if you have none, UpClean arranges the design first.

Service areas

From Sala to the centre and South Saigon

We serve all of Ho Chi Minh City except the former Binh Duong and Vung Tau areas, most often Thao Dien, Thu Thiem, Sala, Phu My Hung and District 1. No travel fee; usually same or next day.

Developments we often serve: Sarimi Sala · The Metropole Thu Thiem · Diamond Island · Estella Heights · Saigon Pearl · Vinhomes Golden River · Sunrise City · Midtown Phu My Hung · Him Lam Riverside · Masteri An Phu · Lakeview City · See all developments

Come home lighter today.

Share a few details and we'll confirm your specialist, time window and fixed price.

Or leave your number — we'll call you back

By sending, you agree that UpClean uses this number to call you back, per our Privacy Policy.

Call nowWhatsAppBook a survey