Skip to content
Illustration: A specialist on a step ladder wiping tall wooden cabinets in a home

The old house down, cleanly, so the new one can begin.

House demolition and strip-out in Ho Chi Minh City

UpClean arranges demolition of single-storey and low-rise houses, and strip-out of fittings, partitions and ceilings before a renovation, in Ho Chi Minh City.

Fixed price

Quoted by floor area, structure, access and debris volume

Indicative prices. Your Up specialist confirms a fixed price before any work begins.

Price and promises

House demolition: key facts

The crew screens for dust, works from the top down to protect neighbouring houses, salvages scrap and removes the debris; any salvage value is stated in advance and can be credited against the price. If the building requires a demolition permit, the owner obtains it first, and a condition record with neighbours is advised for attached houses. High-rise and special structures are quoted separately after a survey.

Price
Quoted by floor area, structure, access and debris volume. Agreed before we start — no surprises.
Hours
7:00 AM – 8:00 PM, seven days a week
Areas
All of Ho Chi Minh City within its former boundaries, with no travel fee; most often Sala, Thu Thiem, Thao Dien, Phu My Hung and District 1.
On time
More than 15 minutes late, and you receive 10% off.
Guarantee
Any warranty terms are stated in your written quote; UpClean follows up on feedback after the job.
Report
Up Report: before/after photos and checklist via WhatsApp or Zalo.
Payment
After sign-off, by bank transfer or cash; larger projects may require a deposit. VAT invoices available.

Last updated

What's included

What's included in house demolition?

  • Single-storey and low-rise houses taken down top to bottom
  • Fittings, partitions, ceilings and tiles stripped out
  • Dust screening and damping
  • Steel, timber and aluminium salvaged; value credited if agreed
  • Debris taken to a licensed receiving site

When to book

When do you need house demolition?

  • Old house to be replaced
  • Renovation needing a full strip-out
  • Shop unit returned to its original state

How we work

Our 4-step house demolition process

  1. 01

    Send photos

    Floors, area and scope on WhatsApp +84 773 521 104.

  2. 02

    Site check

    Structure, neighbours and truck access reviewed.

  3. 03

    Quote & permits

    Written price with salvage noted; owner handles any permit.

  4. 04

    Demolish & clear

    Screened, dismantled, debris removed, site swept.

Illustration: A team cleaning a space after construction ahead of handover
Illustration: A specialist using a wet vacuum to dry a floor after construction
Illustration: A specialist cleaning a home entrance after building work
Illustration: A specialist cleaning skirting and floors after construction
Illustration: A specialist vacuuming a bedroom after construction and fit-out
Illustration: A worker in hi-vis and protective gear vacuuming a site after construction
Illustration: A worker carrying a bucket through a post-construction area beside safety warning signs
Illustration: A specialist scrubbing the floor and cleaning skirting indoors
Illustration: A specialist on a step ladder wiping tall wooden cabinets in a home

Why UpClean

What makes our house demolition different?

Neighbours protected

Screening first, top-down work, stop at any sign of impact.

Salvage in writing

Stated in the quote, not adjusted afterwards.

Site left clear

Can be followed by levelling in the same job.

Up Report

House demolition

08:42Before
09:31After
  • ✓Single-storey and low-rise houses taken… — done
  • ✓Fittings, partitions, ceilings and tiles… — done
  • ✓Dust screening and damping — done
  • ✓Steel, timber and aluminium salvaged; value… — done

Note: all items completed to the Up Standard, with a suggested date for the next visit.

Sample report format

After every visit, your Up Report arrives by WhatsApp or Zalo. Learn more

Frequently asked questions

House demolition: your questions

Do I need a permit?+

If the building requires a demolition permit under local rules, the owner obtains it before work starts. Your ward office can confirm.

Do you demolish high-rise buildings?+

No. This service covers single-storey and low-rise houses and renovation strip-outs only.

Service areas

From Sala to the centre and South Saigon

We serve all of Ho Chi Minh City except the former Binh Duong and Vung Tau areas, most often Thao Dien, Thu Thiem, Sala, Phu My Hung and District 1. No travel fee; usually same or next day.

Developments we often serve: Sarimi Sala · The Metropole Thu Thiem · Diamond Island · Estella Heights · Saigon Pearl · Vinhomes Golden River · Sunrise City · Midtown Phu My Hung · Him Lam Riverside · Masteri An Phu · Lakeview City · See all developments

Come home lighter today.

Share a few details and we'll confirm your specialist, time window and fixed price.

Or leave your number — we'll call you back

By sending, you agree that UpClean uses this number to call you back, per our Privacy Policy.

Call nowWhatsAppBook a survey