Skip to content
Illustration: A specialist on a step ladder wiping tall wooden cabinets in a home

A sound building, on schedule, ready to run.

Factory and pre-engineered steel building construction

UpClean arranges design and construction of factories, warehouses and pre-engineered steel buildings in Ho Chi Minh City: foundations, fabricated and primed steel frames, metal roofing, cladding, gutters, heavy-duty slabs and factory power.

Fixed price

Quoted from a bill of quantities after survey and design

Indicative prices. Your Up specialist confirms a fixed price before any work begins.

Price and promises

Factory & steel building construction: key facts

Floors can be finished with concrete grinding or epoxy, and an industrial cleaning crew prepares the site before handover. The owner holds the building permit and fire safety approvals required by law, with UpClean coordinating the paperwork; scope, timeline and price are set in the contract.

Price
Quoted from a bill of quantities after survey and design. Agreed before we start — no surprises.
Hours
7:00 AM – 8:00 PM, seven days a week
Areas
All of Ho Chi Minh City within its former boundaries, with no travel fee; most often Sala, Thu Thiem, Thao Dien, Phu My Hung and District 1.
On time
More than 15 minutes late, and you receive 10% off.
Guarantee
Any warranty terms are stated in the written contract; UpClean follows up on feedback during and after construction.
Report
Up Report: before/after photos and checklist via WhatsApp or Zalo.
Payment
After sign-off, by bank transfer or cash; larger projects may require a deposit. VAT invoices available.

Last updated

What's included

What's included in factory & steel building construction?

  • Site survey and structural design
  • Foundations, columns and heavy-duty slab
  • Steel frame fabrication, priming and erection
  • Roofing, cladding, gutters, doors, ventilation
  • Factory power; ground or epoxy floor finish
  • Industrial cleaning before handover

When to book

When do you need factory & steel building construction?

  • A new factory or warehouse
  • Extending with a steel building
  • Re-roofing or re-flooring an old plant

How we work

Our 4-step factory & steel building construction process

  1. 01

    Brief

    Share location, size, use and timeline on WhatsApp +84 773 521 104.

  2. 02

    Survey & design

    Layout, structure and cost estimate.

  3. 03

    Contract & approvals

    Quantities, timeline, price; permit and fire safety coordination.

  4. 04

    Build & hand over

    Staged sign-off, cleaning and handover.

Illustration: A team cleaning a space after construction ahead of handover
Illustration: A specialist using a wet vacuum to dry a floor after construction
Illustration: A specialist cleaning a home entrance after building work
Illustration: A specialist cleaning skirting and floors after construction
Illustration: A specialist vacuuming a bedroom after construction and fit-out
Illustration: A worker in hi-vis and protective gear vacuuming a site after construction
Illustration: A worker carrying a bucket through a post-construction area beside safety warning signs
Illustration: A specialist scrubbing the floor and cleaning skirting indoors
Illustration: A specialist in a brown protective uniform using a backpack sprayer for pest control in a factory

Why UpClean

What makes our factory & steel building construction different?

Frame to clean floor

Steel, slab, epoxy and cleaning in one contract.

Clear quantities

Variations only with written approval.

Approvals planned in

Permit and fire safety built into the schedule.

Up Report

Factory & steel building construction

08:42Before
09:31After
  • ✓Site survey and structural design — done
  • ✓Foundations, columns and heavy-duty slab — done
  • ✓Steel frame fabrication, priming and erection — done
  • ✓Roofing, cladding, gutters, doors, ventilation — done

Note: all items completed to the Up Standard, with a suggested date for the next visit.

Sample report format

After every visit, your Up Report arrives by WhatsApp or Zalo. Learn more

Frequently asked questions

Factory & steel building construction: your questions

How much does a steel building cost?+

It depends on size, height, span, loads, roofing and floor; you get a priced bill of quantities after survey and design.

Who handles the permits?+

The owner holds the permit and fire safety approvals; UpClean helps prepare and coordinate the files.

Service areas

From Sala to the centre and South Saigon

We serve all of Ho Chi Minh City except the former Binh Duong and Vung Tau areas, most often Thao Dien, Thu Thiem, Sala, Phu My Hung and District 1. No travel fee; usually same or next day.

Developments we often serve: Sarimi Sala · The Metropole Thu Thiem · Diamond Island · Estella Heights · Saigon Pearl · Vinhomes Golden River · Sunrise City · Midtown Phu My Hung · Him Lam Riverside · Masteri An Phu · Lakeview City · See all developments

Come home lighter today.

A specialist surveys your home free of charge and sends a fixed quote before any work begins.

Or leave your number — we'll call you back

By sending, you agree that UpClean uses this number to call you back, per our Privacy Policy.

Call nowWhatsAppBook a survey